| On Thursday, October
31, 2002, the driveway and parking lot was in final preparation for
paving. Then on Thursday, November 7th, the precast concrete planks
arrived for installation on the area between the brick school building and
the new parish center. The following pictures are photos from those
stages of our construction.
To see a photo, click on one of the thumbnails to
enlarge the photo.
|
 |
 |
 |
 |
| The workers finish the prep work
near the church for the new driveway that will exit the parking lot. |
The paving begins with the
equipment in place and they start along the stone wall. |
The project gets underway and our
new parking lot becomes a reality. |
The workers finish the area long
the stone wall. |
 |
 |
. |
 |
| Another view of the paving. |
A look across the parking lot
waiting to be paved. |
The asphalt moves across the yard
to become a parking lot. |
The area behind the church is
finished first. |
 |
 |
 |
|
| The trucks with the hot asphalt
move into place. |
A view of the area behind the
rectory and next to the church. |
A longer shot of the same view as
the project makes progress. |
Visible progress as the yard is
paved an available with more room for cars. |
 |
 |
 |
 |
| A view of the completed project
as the new exit is in place. |
The crane that was needed to lift
the precast concrete planks into place. |
One of the planks is hoisted from
the truck to be placed. |
The plank begins to be airborne
as it is lifted into position. |
 |
 |
 |
 |
| Another angle to view the plank
as it starts its ascent. |
The plank rises with the new
center in the background. |
Higher and higher ... |
and higher ... |
 |
 |
 |
 |
| and still higher ... |
and yet higher ... |
once over the building it is
lowered into place between the two structures. |
Its placed between the brick
school on the left and the new building to the right. |
 |
 |
 |
 |
| A view of the work so far,
looking from the rear of the rectory, the area closest is where the chapel
is to be located. |
A perspective of our newly
completed parking lot looking east from behind the school toward the
church. |
Ed and Phil work on the site of
the new garage to prepare the footings. |
A view of the building so far of
the main entrance on Hamilton Street. |
 |
 |
 |
 |
| Looking up from the basement
through the layers of the building where the central stairway will be
located. |
A view of the forms for the
stairs that will lead from the entrance on Hamilton Street to a doorway in
the basement. To the right is a rampway. |
A perspective of the basement
area closest to the parking lot which will be used for
storage. It is located under the chapel. |
A view of the terrace underneath,
outside the cafeteria door (which is to the left, the new building is on
the right, Hamilton St is straight ahead). |
 |
 |
 |
 |
| From the front corner nearest the
rectory through a function room across toward the school. |
A view of the area that will be
used as a food bank once complete. To the center is the doorway from
the street to the basement. |
A perspective of the terrace with
the precast cement planks in place. This area is between the gym and
the new center. |
Another view of the terrace,
looking more toward the school. |
 |
 |
 |
 |
| A front corner angle of the
building as seen from Hamilton Street during a snowstorm. |
A view from the rectory of the
attic toward the parking lot. The chapel area is on the left. |
Another attic view of the front
of the building where one can see that the floors are ready for warmer
weather. |
Another view of the front of the
building taken from the attic for a perspective looking at each of the
floors. |
 |
 |
 |
 |
| The building takes its form as
the roof is lined with the knee wall framing. |
A view from Hamilton
Street. The open space is where a pointed gable will be constructed. |
The view from the rectory,
showing the various levels. |
The view from the church doors
with the chapel area front and center. |
 |
 |
 |
 |
| Part of our reconstruction
includes a new garage. Here the footings are in place.
|
A view from the driveway of the
new angle of the garage to facilitate parking and movement. |
A close up view of the footings
for the new garage. Notice that they are pinned since the rock is
close to the surface. |
The cement arrives for the
pouring of the footings and the new garage is closer to reality. |
 |
 |
 |
 |
| The pouring takes place for a new
garage to be constructed. |
Despite our best hopes, the
winter has turned harder and colder earlier than expected, the building is
wrapped to pour the concrete floors. |
A view from the parking lot of
the building as the second floor wrapping is complete. |
A view from the entrance of
parking lot as the building near the school is closed in for heating
purposes to pour the flooring. |
 |
 |
 |
 |
| Inside the wrapping, a look at
the floors poured on January 15th. |
This area is the chapel.
The blue tarp overhead will be a skylight. |
This is from the second floor
looking down through the stairway. |
This area is the doorway that
faces Hamilton St where a porch will be. |
 |
 |
 |
 |
| This area is on the second floor
and is over the doorway from the parking lot. To the right is the
chapel roof. |
This area is also the second
floor and is a look from further back from the picture to the
left. |
This area, with the ramp, is on
the second floor, above the large meeting room, and will be
classrooms. |
This is the second floor area,
over the conference room, closest to the parking lot and the school. |
|
|
|
|