| With the floors
poured at the beginning of January, work was steady through the
winter. Eventually in April our cold difficult weather finally broke
and the wrapping was removed from the building. Following that the
roof was secured and the skylights and gables constructed. Some of
those photos have misplaced at this time, when they are found, they will
be posted. In the meantime, as of May 1st, the following pictures are photos from
this stage of our construction.
To see a photo, click on one of the thumbnails to
enlarge the photo.
|
 |
 |
 |
 |
| The end sections for the chapel
skylight wait to be hoisted. |
Another view of the sections with
the building in the background. |
The workers prepare the area over
the main stairway of the installation of the skylight |
A look over the wall and down to
the chapel area where the skylight will be installed. |
 |
 |
 |
 |
| The ceiling and roof for the
gable that will face Hamilton St takes shape. |
A side view of the construction
of the roof line for the gable. |
The skylight over the main stairs
as seen from above at the roof. |
Another view of the skylight and
the surrounding roof area. |
 |
 |
 |
 |
| A view of the atrium over the
main stairway at the second floor landing. To the left the elevator
will be located. |
A look at the skylight and roof
of the chapel looking toward the parking lot. The gable at the far
end will be covered in painted metal and capped with a cross. |
This will be the conference
room. The windows overlook the parking lot and the school area. |
This is the main office area, for
the secretaries and pastor. The windows overlook the area next to
the rectory that will be a playground for the school. |
 |
 |
 |
 |
| A view of the chapel from
inside. The opening at the top is a skylight, the window looks out
to the church beyond. |
A view of the main room that will
have a terrace outside it as a secure space between the buildings. A
view from underneath is at the end of the page. |
A photo of the kitchen area,
looking beyond to a doorway that leads to the service area between the
present school and our new center. To the right is the main room. |
A shot of the lavatories that are
located on the main floor. The piping is located in the wall between
the men's at front and the women's beyond. |
 |
 |
 |
 |
| This room is at the front of the
building and is housed in the gable that faces Hamilton St. |
This is the other end of that
same room with the gable. Beyond is the roof, to the left stairs. |
This is a corridor that will lead
to offices on the second floor that will overlook Hamilton St. |
This is an area of classrooms
that faces the school and adjacent to the gable at the front. |
 |
 |
 |
 |
| This area is on the second floor
and will be classrooms that will face the parking lot. |
This area is in the
basement. The openings beyond are windows facing the rectory. |
Around the corner from the photo
at left is this remainder of the room looking toward some closets at the
back of the room. |
This room will house our Food
Pantry organized and run by Saint Vincent de Paul. Larger and with
easier access we hope to improve service. |
 |
 |
 |
 |
| The building as it rises from
Hamilton Street as of May 1st. |
A view of the side of building as
it faces the rectory showing the three levels. The parking lot is
beyond the building |
The chapel end near the parking
lot. The peak of this gable will hold the cross removed from the
building lost in the fire. |
A view from the rooftops looking
across the chapel area to the rectory and the church beyond. |
 |
 |
 |
 |
| A photo of the
electrical panels in the basement of the new building. This will service
all of the electrical needs of our building, including air conditioning. |
A view of the
area that is outside the school's cafeteria door and under the
terrace. This passageway will enable handicap access to the
cafeteria. |
The materials for the
construction of the elevator arrive and are stored inside the entrance
from the parking lot. |
A look at the beginnings of the
elevator with the brace at the base of the shaft that will support the box
of the elevator. |
 |
 |
 |
 |
| A photo of the motor that will
drive the elevator once in operation. |
A close up of the front gable
with the metal fabricated roof in place. |
A view of the chapel area as the
outside walls are installed. |
A larger shot of the chapel area
and the work being done. |
 |
 |
 |
 |
| A view from the front of the
rectory as the building becomes enclosed and the finishes applied. |
A view of the building from the
parking lot. The roof line is taking shape with the installation of
the painted trim. |
A view over the chapel showing
the skylight and the metal cap to the left which will be over the
sanctuary of the new worship space. |
One of the auxiliary items of the
master plan was the relocation of a garage. Here, looking toward
Pine St, the first floor takes shape. |
 |
 |
 |
 |
| From the side facing the rectory,
the two stalls become apparent. |
A view from the second floor of
the new building shows the progress on the garage. |
The front of the second floor is
raised in place. |
The back wall of the second floor
is secured. |
 |
 |
 |
 |
| Another view of the garage as the
walls take shape. |
A view from the other side as the
second floor is constructed. |
The beam at the point is
installed and secured. |
The beam is readied for the
rafters to hold the roof. |
 |
 |
 |
 |
| The rafters for the roof are
readied for installation. |
The roof is almost complete. |
Waiting for the doors and siding. |
A view from the center of the
garage as it moves toward completion. |
 |
 |
 |
 |
| A view of the garage after the
pouring of the floors. To the left of the garage is the pad for the
dumpsters for trash. |
A view of the elevator as it
takes shape on the main floor of the new center. |
A look up at the maze of piping
that winds its way through the building for heating, plumbing and
drainage. |
Missing a couple of doors, the
garage is almost done! To the right is a backup generator for the
new center. |
 |
 |
 |
 |
| A view from the side of the
completed garage. The cement pad to the left is for the dumpsters. |
The stone facing starts to climb
up the wall outside the chapel area. |
The inside hall gets a finishing
touch. Beyond the wall is the chapel area. |
The empty boxed area is left for
the cornerstone. Beyond the wall will be the main office. |
 |
 |
 |
 |
| A corner near the school gets
faced with stone. The parking lot lies beyond. |
A look at the freight elevator
after its delivery. Waiting for installation, it is protected from
the rain. |
A view of the terrace area,
waiting for a finish coat of cement and aluminum grids around the
edges. To the front left is the space for the freight elevator. |
The front of the building facing
Hamilton Street is another area where the chapelstone has been installed
already. |
 |
 |
 |
 |
| On June 28th, bishop Reilly
placed the cornerstone for the building. It is a piece of granite
salvaged from the building lost in the fire. For
photos click here |
With the stone almost completely
in place, the back corner nearest the school shapes up, ready for the
installation of the windows. |
A view of the offices and
classrooms outside wall that faces the rectory. This is the first
wall completely finished in the stone work. |
The front of the building as it
faces Hamilton Street begins to take shape and a finished appearance of
the building comes into focus. |
 |
 |
 |
 |
| A view of the outside wall across
from the cafeteria. This wall is completed in a different stone to
cut costs. |
A closer view of the wall and the
split face stone across from the brick school cafeteria. |
A view of the end of the chapel
area as the stone rises along the wall. |
A view of the area that will the
conference room with the new windows in place. |
 |
 |
 |
 |
| A view of the corner of our new
building nearest the school and parking lot. |
A shot of the area between the
buildings that will be service alley. This view shows that the buildings
do not connect. |
A view of the side of the church
following the removal of the RENEW tree to prepare for parking. |
Its new location at the corner of
the parking lot. |
 |
 |
 |
 |
| A view from the street of a new
entrance to the church from Marcy Street. |
A view of the new entrance that
can be accessed from the parking lot. |
A view of the new entrance from
Marcy Street that eliminates steps and is handicapped accessible. |
Enlarging the platform for the
dumpsters so that they can both fit and be accessed by the company truck. |