     Construction Progress

Page 4

With the floors poured at the beginning of January, work was steady through the winter.  Eventually in April our cold difficult weather finally broke and the wrapping was removed from the building.  Following that the roof was secured and the skylights and gables constructed.  Some of those photos have misplaced at this time, when they are found, they will be posted.  In the meantime, as of May 1st, the following pictures are photos from this stage of our construction.

To see a photo, click on one of the thumbnails to enlarge the photo.

tepeeground.jpg (231456 bytes) panelground.jpg (233697 bytes) roof.jpg (238834 bytes) chapel.jpg (238845 bytes)
The end sections for the chapel skylight wait to be hoisted. Another view of the sections with the building in the background. The workers prepare the area over the main stairway of the installation of the skylight A look over the wall and down to the chapel area where the skylight will be installed.
gablestreet.jpg (201102 bytes) frontgable.jpg (197643 bytes) roofsky.jpg (188887 bytes) roofhill.jpg (220503 bytes)
The ceiling and roof for the gable that will face Hamilton St takes shape. A side view of the construction of the roof line for the gable. The skylight over the main stairs as seen from above at the roof. Another view of the skylight and the surrounding roof area.
atrium.jpg (227354 bytes) chapelroof.jpg (199802 bytes) confroom.jpg (233111 bytes) mainoffice.jpg (201246 bytes)
A view of the atrium over the main stairway at the second floor landing.  To the left the elevator will be located. A look at the skylight and roof of the chapel looking toward the parking lot.  The gable at the far end will be covered in painted metal and capped with a cross. This will be the conference room.  The windows overlook the parking lot and the school area. This is the main office area, for the secretaries and pastor.  The windows overlook the area next to the rectory that will be a playground for the school.
chapelinterior.jpg (571891 bytes) roomterrace.jpg (194055 bytes) kitchen.jpg (241717 bytes) lavs.jpg (214892 bytes)
A view of the chapel from inside.  The opening at the top is a skylight, the window looks out to the church beyond. A view of the main room that will have a terrace outside it as a secure space between the buildings.  A view from underneath is at the end of the page. A photo of the kitchen area, looking beyond to a doorway that leads to the service area between the present school and our new center.  To the right is the main room. A shot of the lavatories that are located on the main floor.  The piping is located in the wall between the men's at front and the women's beyond.
frontgablein.jpg (440830 bytes) frontgablerev.jpg (282660 bytes) offices.jpg (216960 bytes) classrms.jpg (226387 bytes)
This room is at the front of the building and is housed in the gable that faces Hamilton St. This is the other end of that same room with the gable.  Beyond is the roof, to the left stairs. This is a corridor that will lead to offices on the second floor that will overlook Hamilton St. This is an area of classrooms that faces the school and adjacent to the gable at the front.
classrooms.jpg (209506 bytes) multipurm.jpg (198445 bytes) closets.jpg (180758 bytes) foodbank.jpg (196414 bytes)
This area is on the second floor and will be classrooms that will face the parking lot. This area is in the basement.  The openings beyond are windows facing the rectory. Around the corner from the photo at left is this remainder of the room looking toward some closets at the back of the room. This room will house our Food Pantry organized and run by Saint Vincent de Paul.  Larger and with easier access we hope to improve service.
outfront.jpg (227228 bytes) sideview.jpg (349527 bytes) chapelgable.jpg (429065 bytes) roofviews.jpg (312340 bytes)
The building as it rises from Hamilton Street as of May 1st. A view of the side of building as it faces the rectory showing the three levels.  The parking lot is beyond the building The chapel end near the parking lot.  The peak of this gable will hold the cross removed from the building lost in the fire. A view from the rooftops looking across the chapel area to the rectory and the church beyond.
lightpanel.jpg (382782 bytes) underterrrace.jpg (243088 bytes) elevatorboxes.jpg (195043 bytes) elevatorbase.jpg (669571 bytes)
A photo of the electrical panels in the basement of the new building. This will service all of the electrical needs of our building, including air conditioning. A view of the area that is outside the school's cafeteria door and under the terrace.  This passageway will enable handicap access to the cafeteria. The materials for the construction of the elevator arrive and are stored inside the entrance from the parking lot. A look at the beginnings of the elevator with the brace at the base of the shaft that will support the box of the elevator.
elevatormotor.jpg (208410 bytes) Gfrontgable.jpg (321687 bytes) Gchapelwalls.jpg (218379 bytes) gchapel.jpg (505153 bytes)
A photo of the motor that will drive the elevator once in operation. A close up of the front gable with the metal fabricated roof in place. A view of the chapel area as the outside walls are installed. A larger shot of the chapel area and the work being done.
Gmovingon.jpg (237038 bytes) chapelroof.jpg (190801 bytes) chapelsky.jpg (169529 bytes) beginning.jpg (206681 bytes)
A view from the front of the rectory as the building becomes enclosed and the finishes applied. A view of the building from the parking lot.  The roof line is taking shape with the installation of the painted trim. A view over the chapel showing the skylight and the metal cap to the left which will be over the sanctuary of the new worship space. One of the auxiliary items of the master plan was the relocation of a garage.  Here, looking toward Pine St, the first floor takes shape.
doors.jpg (251597 bytes) birdseye.jpg (236698 bytes) secondflr.jpg (302054 bytes) ends.jpg (304729 bytes)
From the side facing the rectory, the two stalls become apparent. A view from the second floor of the new building shows the progress on the garage. The front of the second floor is raised in place. The back wall of the second floor is secured.
sideview.jpg (316286 bytes) takingshape.jpg (282958 bytes) gbeam.jpg (245363 bytes) gbeam2.jpg (292339 bytes)
Another view of the garage as the walls take shape. A view from the other side as the second floor is constructed. The beam at the point is installed and secured. The beam is readied for the rafters to hold the roof.
grafters.jpg (230400 bytes) groof.jpg (271260 bytes) done.jpg (247426 bytes) birdseyedone.jpg (207910 bytes)
The rafters for the roof are readied for installation. The roof is almost complete. Waiting for the doors and siding. A view from the center of the garage as it moves toward completion.
6Dumpsterpad.jpg (200912 bytes) 6Elevator.jpg (314590 bytes) 6pipes.jpg (236915 bytes) Garagefront.jpg (297435 bytes)
A view of the garage after the pouring of the floors.  To the left of the garage is the pad for the dumpsters for trash. A view of the elevator as it takes shape on the main floor of the new center. A look up at the maze of piping that winds its way through the building for heating, plumbing and drainage. Missing a couple of doors, the garage is almost done!  To the right is a backup generator for the new center.
Garageside.jpg (297980 bytes) Chapelwall.jpg (348490 bytes) Chapelwallinside.jpg (724773 bytes) Cornerstone.jpg (511005 bytes)
A view from the side of the completed garage.  The cement pad to the left is for the dumpsters. The stone facing starts to climb up the wall outside the chapel area. The inside hall gets a finishing touch.  Beyond the wall is the chapel area. The empty boxed area is left for the cornerstone.  Beyond the wall will be the main office.
corner.jpg (339751 bytes) Freightlift.jpg (344952 bytes) terrace.jpg (240246 bytes) front.jpg (229158 bytes)
A corner near the school gets faced with stone.  The parking lot lies beyond. A look at the freight elevator after its delivery.  Waiting for installation, it is protected from the rain. A view of the terrace area, waiting for a finish coat of cement and aluminum grids around the edges.  To the front left is the space for the freight elevator. The front of the building facing Hamilton Street is another area where the chapelstone has been installed already.
Finishing.jpg (264864 bytes) 3Backcorner.jpg (257878 bytes) 3Officefacing.jpg (284749 bytes) 3front.jpg (260870 bytes)
On June 28th, bishop Reilly placed the cornerstone for the building.  It is a piece of granite salvaged from the building lost in the fire.  For photos click here With the stone almost completely in place, the back corner nearest the school shapes up, ready for the installation of the windows. A view of the offices and classrooms outside wall that faces the rectory.  This is the first wall completely finished in the stone work. The front of the building as it faces Hamilton Street begins to take shape and a finished appearance of the building comes into focus.
Wcafeteria.jpg (233675 bytes) Wcafeteria2.jpg (433446 bytes)
A view of the outside wall across from the cafeteria.  This wall is completed in a different stone to cut costs. A closer view of the wall and the split face stone across from the brick school cafeteria. A view of the end of the chapel area as the stone rises along the wall. A view of the area that will the conference room with the new windows in place.
wside.jpg (317123 bytes) wrenew.jpg (384234 bytes)
A view of the corner of our new building nearest the school and parking lot. A shot of the area between the buildings that will be service alley. This view shows that the buildings do not connect. A view of the side of the church following the removal of the RENEW tree to prepare for parking. Its new location at the corner of the parking lot.
wramp.jpg (346982 bytes) Wsidedoor.jpg (335535 bytes) wramp2.jpg (194313 bytes) Wduplatform.jpg (313067 bytes)
A view from the street of a new entrance to the church from Marcy Street. A view of the new entrance that can be accessed from the parking lot. A view of the new entrance from Marcy Street that eliminates steps and is handicapped accessible. Enlarging the platform for the dumpsters so that they can both fit and be accessed by the company truck.

<<back to construction page 1